Americas Center, St. Louis, MO
Project required “welding the cracks” prior to system installation. Shot-blast preparation with double broadcast of color quartz aggregate.
Finish coat of abrasion resistant aliphatic urethane due to extreme traffic.
Result: Decorative, long-lasting, and low maintenance floor system.
Result: Decorative, long-lasting, and low maintenance floor system.